Search Alabama Coastal Restoration Submitted Projects
Suggested Project Number:
66:Marine Mammal Conservation and Recovery in the Gulf of Mexico through support of the Alabama Marine Mammal Stranding Network
67:Little Point Clear Unit - land protection
68:Habitat enhancement, restoration, and preservation of beach and dune systems of coastal Alabama
70:Establishment and evaluation of protected oyster spawning aggregates in Mississippi Sound
71:Enhanced Fisheries and Ecosystem Monitoring in Alabama’s Marine Waters and the Gulf of Mexico
72:Grand Bay Acquisition
73:Fish River Watershed Restoration Project
74:Restoration of the Diamondback Terrapin, a Keystone Species in the Salt Marshes of Alabama
77:Half-Shell High School: Oyster Restoration in the Mississippi Sound
78:Lower Perdido Bay Restoration
79:Aloe Bay Harbour Town
81:Independent External Peer Review of Dauphin Island's West End Beach Restoration Project
82:Dauphin Island Audubon Bird Sanctuary Shoreline Restoration and Management
83:Oyster Restoration in Coastal Alabama
84:Environmental Restoration of Cotton Bayou and Terry Cove Canals
85:Oyster Bay Wetlands Preservation and Enhancement Project
86:Cotton Bayou – Perdido Islands Beneficial Use Restoration
87:Improved Bypassing of Beach Sands Dredged from the Mobile Ship Channel
88:Floodplain conservation easements
89:Dauphin Island- Aloe Bay Beneficial Use Restoration
90:Alabama Coastal Restoration Program
91:Fill Borrow Pits Dug in 2010 to Protect Against Oil Spill Damage
92:West End Beach and Barrier Island Restoration Project
93:Dauphin Island Beach Nourishment Feasibility Study
96:BON SECOUR WETLANDS PRESERVATION AND HABITAT PROTECTION PROJECT
97:Alabama Artificial Reef Plan - Phase I
98:Stormwater Quality Rehabilitation Project
99:Upper Wolf Bay Savanna and Marsh Acquisition for Conservation
100:Dauphin Island Sea Lab Research Building
101:Alabama Cooperative Aquatic Animal Health Network
102:Alabama Audubon Coastal Bird Stewardship Program (AACBSP)
103:Gulf Coast Wildlife Recovery & Interpretive Center: Feasibility, Planning and Preliminary Design Phase (Phase I)
104:Habitat Acquisition and Conservation for Neotropical Migratory Birds
105:Benton Tract
106:Mobile Bay Preservation and Restoration; Lower Fly Creek Reach Project
107:Gulf Coast Environment Research Station
108:Expansion of Auburn University Shellfish Laboratory
109:Habitat enhancement of marine fisheries off coastal Alabama.
110:Laguna Cove Little Lagoon Natural Resource Protection
111:Spanish Fort Ecological Park
112:Identification, Prioritization, and Quantitative Assessment of Ecosystem Benefits of Restoration Actions within the Perdido and Perdido Bay Watersheds
113:Little Point Clear Unit - Bon Secour National Wildlife Refuge - Three Rivers tract acquisition
124:Shoreline and marsh rehabilitation in the Northeast Point-aux-Pines Peninsula (Bayou La Batre, Alabama)
126:Fairhope’s Coastal Environmental Education Network (CEEN)
127:City of Prichard Land Acquisition Project
128:Development of a sustainable groundwater management plan to support long-term economic growth in Baldwin County
129:Harrod Tract Addition to the Weeks Bay Reserve
130:Alabama Real-Time Coastal Observing System
132:Gulf Highlands
134:GulfQuest Galleries (Exhibits and Programs)
135:GulfQuest Blockbuster Exhibitions
136:Coastal Industrial Base Analysis and Impact of Jobs Lost
144:Enhancing Oyster Restoration Efforts in Coastal Alabama
145:Mobile Causeway Hydrologic Restoration Project
146:Mobile Bay High Frequency Radar Network
147:Infrastructure advancement for Marine Observations in Coastal Alabama (IMOCA)
150:Upper Mobile Bay Marsh Creation Project
151:Repairs to the Fort Morgan Fishing Pier
152:Promotions for Fort Morgan State Historic Site
153:Gulf of Mexico Alliance Restoration Coordination
154:Sustainable Gulf Coast Oyster Restoration and Coastal Protection using Central Oyster Hatcheries and Gulf State Remote Setting Sites
155:Sanitary Sewer Construction Project
156:Characterization and Delineation of Significant Sand Resource Areas Essential for Beach Restoration, Offshore Alabama
157:Development and operation of an apparatus to monitor the fate and transport of volatile organic contaminants in aquatic ecosystems.
158:Graham Creek Nature Preserve Expansion
159:Wolf Creek Park Expansion
160:Regional Sediment Management/Beneficial Use and Small Scale Habitat Restoration
161:Comprehensive weather, water, and sediment-influx monitoring in Mobile and Baldwin County using terrestrial- and riverine-based sensing systems.
162:Coffee Island and South Point aux Pins - Coastal Habitat Restoration, Analysis and Design
163:Mobile County Emergency Operations Center
164:Mobile County Conservation Acquisition
165:Yancey Branch Watershed Restoration
166:Comprehensive Coastal Monitoring and Community Engagement Network (COCO)
167:D'Olive Creek Watershed Land Acquisition
168:Three Mile Creek Lower Watershed Land Acquisition and Planning
169:Tracking the Ecological and Engineering Performance of Alabama's Early Coastal Restoration Projects: a Centralized, Comprehensive Monitoring Program
170:Our Road Tract Acquisition
172:ALABAMA STATE PORT AUTHORITY AUTOMOTIVE/RO-RO TERMINAL
174:USA Coastal and Environmental Sciences Initiative (USA-CES)
175:Historic Africatown Welcome Center
176:PROPOSED MEAHER FAMILY HOME
177:Hog Bayou Campground and RV Plaza
179:Conservation, Preservation and Protection of Hog Bayou, Mobile County
180:The Earth Solutions Lab at the University of South Alabama
181:Effects of Disturbance and Habitat Degradation on Community Resilience, Food Web Dynamics, and Ecosystem Integrity in the Mobile-Tensaw Delta
182:Assessment and Protection of the Mobile/Tensaw Delta and the coastal streams of Alabama
183:Big Creek Lake Reservoir Spill Containment Structure
184:Alabama Harmful Algal Bloom (ALHAB) Program Initiative
185:Low Pressure Sewer System To Replace On-Site Systems in Sensitive Riverine Areas
186:Biopolymer Based Materials for the Removal of Harmful Metals from Mobile Bay Water
187:USA Center of Environmental Resiliency and Training (USA-CERT)
188:Coastal Sustainable Tourism Laboratory
189:Perch Creek Nature Trail at McNally Park
190:Mitigating Barotrauma in Red Snapper and Other Reef Fishes: A Means to Expedite Population Recovery and Increase Recreational Fishing Season Length
191:Stormwater Wetland Construction in Big Creek Lake Watershed
192:Waterline Crossing to Serve as an Emergency Backup Line to Spanish Fort Area
193:Pumps to Supply Emergency Backup Water Source
194:The World-Beater® All-Beach 10K
196:Mobile County Soccer & Aquatic Center Complex
198:Development for a Regional Strategic Plan for the Coastal Alabama Region
199:Bayfront Park Restoration and Improvement
200:Chickasabogue Park Habitat Restoration and Enhancement
201:Southeast Mobile County Sanitary Sewer/Oyster Reefs Protection Project
202:Household Hazardous Waste Collection Day Program
203:Using Off-Bottom Oyster Farming to Restore Alabama Oyster Reefs
204:City of Foley Regional Stormwater Wetland
205:BLM Fort Morgan "Our Road" Acquisition
209:Bayou La Batre US 98 Express
210:Infrastructure Improvements of existing park and green spaces, including conversion of an existing vacant railroad easement to a pedestrian and bike path.
211:Drainage and Sewer Infrastructure Improvements of facilities along West Turner Road and Dunlap Circle
212:City of Chickasaw Sewer Rehabilitation Project
213:Reuse Water System for the City of Foley and Blue Collar Country Sports and Entertainment Complex
214:Old Fowl River/Mobile Bay/SaltAire Nature Preserve
215:Dauphin Island Wastewater Treatment and Outfall Improvements
216:Dauphin Island Water Supply
217:Planning for Economic Diversification of Bayou la Batre and Surrounding Area
218:Redevelop City Docks
219:CHARLIE DMMA Rehabilitation and Bayou Coden Maintenance Dredging
220:DELTA DMMA Rehabilitation and Bayou La Batre Maintenance Dredging
221:Enhanced Nutrient Removal at the Saraland Wastewater Treatment Facilty
222:City of Saraland
223:Northwest Satsuma Water and Sewer Project
224:Dauphin Island Acquisition
225:Grand Bay Land Acquisition
226:Alabama Artificial Reef Plan
227:Escatawpa River Trail System
228:Mobile County Blueway Trail Development
229:Distribution of flows and flow-rates through the Mobile-Tensaw River Delta
230:Compressed Natural Gas (CNG) Filling Station to Support Economic Development and Reduce Carbon Footprint
231:Sediment geochemistry investigation of the Mobile-Tensaw River Delta
232:Oyster Bay Restoration Feasibility Study
233:DOlive Creek Property Purchase, Habitat Study, and Nutrient Removal Research/Educational Facility
234:Expansion of Helen Wood Park and Preserve
235:Perch Creek Blueway Trail and Park
236:Wastewater Reuse Project for the City of Daphne and the Eastern Shore of Mobile Bay
237:Safe Harbor Dock Facility for Coastal Alabama
238:Brookley Bayfront Preserve
239:Biofiltration for Wastewater Corrosion Control and Elimination of Sanitary Sewer Overflows
240:Delta Port Marina Oystermen Support Dock
241:Alabama Gulf Seafood Marketing Program
242:Alabama Gulf Coast Recovery Council Older Worker Program
243:Planning Assistance and Infrastructure Development for the USA Environmental and Marine Sciences Building
245:Baldwin Beach Express
246:Development of a laboratory facility for monitoring and characterizing tar balls washing along Alabama's beaches
247:Aloe Bay/Mississippi Sound Water Quality Enhancement Project
248:Assessment of injury to bay, sound, and estuary dolphin stocks in Alabama to support restoration and recovery
249:Fairhope Soccer Complex
250:Promotion of Year-Round Tourism Opportunities on Alabama's Gulf Coast
251:Spanish Fort Estates Erosion Mitigation and Battlefield Preservation
252:Cambron Headcut Repair
253:Development of a community-based tar ball and beach recovery monitoring program
254:Bon Secour River Headwater Restoration
255:Extension of Effluent Force Main from Bayou La Batre WWTF
256:City of Saraland Potable Water Expansion Project
257:Saraland Water Service Water Meter Upgrade and Replacement
258:Shine Road Water Well and Pump Station
259:Iron and Manganese Removal - Sand Filtration - Existing Wells
260:Water Distribution System Upgrades
261:Collection System/Lift Station Upgrades
262:Bayou La Batre WWTF-Class A/EQ Sludge Treatment
263:Bayou La Batre WWTF - Odor Control Upgrade
264:Bayou La Batre WWTF-Handicapped Elevator
265:Bayou La Batre WWTF-Operations Elevated Walk
266:Perdido Watershed Access Improvement
267:NEW STREAM-GAGING STATION ON FISH RIVER AT COUNTY ROAD 32
272:Lillian Park Beach Habitat and Shoreline Protection Improvements
273:Development of a Comprehensive Ecotourism Effort to Provide Jobs and Economic Stability for the Communities of South Mobile County
275:Testing for BP Oil on the Alabama Coast
276:Grand Bay Sewer Service Project
277:Low Pressure Sanitary Sewer for Dauphin Island Parkway
278:Perch Creek Area Sanitary Sewer Trunk Line Cured in Place Pipe (CIPP) Project
279:Enhancement and Stabilization of Priority Coastal Shoreline on Fowl River
280:Survey and shoreline change analysis of Mobile Bay and Mississippi Sound, Baldwin and Mobile Counties, Alabama
281:Sediment characterization and geochemistry distribution within Mobile Bay and Mississippi Sound, Baldwin and Mobile Counties, Alabama
282:Current and wave analysis study of Gaillard Island in Mobile Bay, Mobile County, Alabama
285:Enhancement and Stabilization of Priority Coastal Habitat on Fowl River and a Study of Coastal Marsh Health and Recovery
286:Sea Turtle Conservation and Recovery in the Gulf of Mexico through Development of a Sea Turtle Health Surveillance Network
287:Expansion of the Orange Beach Wildlife Rehabilitation and Education Center
288:Linking water quality, marine food web dynamics, and ecosystem health in Alabama: Improving seafood safety and human health
290:Coastal Avian Rescue & Rehabilitation Center
291:Aloe Bay Harbour Town
292:Lightning Point Acquisition and Restoration Project (AL)
293:Magnolia River Preservation Project – Holmes Property
294:Toward Valuation of the Mobile Bay
295:Mid-Island Parks
296:Promotion of Year-Round Tourism Activities on Dauphin Island, with emphasis on the "off-season."
297:Improving Coastal Water Quality through implementation of Clean Marina Standards
298:GulfQuest Deck 4 Exhibits Completion
300:Sea Turtle Nesting Habitat Beach Equipment Replacement Program
301:New Museum and Visitor Center at Fort Morgan
302:Mobile Point Lighthouse Repair and Restoration
303:Restoration of Peace Magazine
304:Restoration of the Lighthouse Keeper's House
305:Gulf Coast Revolving Loan Fund
306:Habitat Acquisition and Conservation of the Garrow's Bend Watershed-Radcliff -Goat Islands-Mobile Bay
308:Peninsula Living Shoreline
309:Conservation of Upper Three Mile Creek Watershed
310:Longevity, Stability & Water Quality Improvements, Bon Secour DMDA
311:Canby Canyon Erosion Mitigation
313:Dauphin Island Audubon Bird Sanctuary Shoreline Restoration and Management
315:Baldwin Beach Express I-10 to I-65 Extension Right of Way Acquisition
317:Big Creek Lake Land Acquistion
318:Perdido River Water Quality Protection, Habitat Restoration and Recreational Enhancement Project
319:Mount Vernon Water Treatment Plant
320:Assure Timely And Effective Environmental Oversight Of Projects In Coastal Alabama, Including All RESTORE Act Projects, By The Replacement Of Substandard Facilities At The ADEM Coastal Office And Mobile Field Office
321:Alabama State Port Authority Automotive Logistics/Ro-RO Terminal
322:Ambassadors of the Environment Program - Gulf Shores
324:Isle Dauphine Beach and Golf Study
325:Innovating St. Louis Street: Mobile’s Technology Corridor
326:Inventors Lab
327:Baldwin County - ALDOT Capacity Improvements_Rev011317
328:Mobile Area Storm Water Mapping and Resiliency Planning
329:Mobile Greenway Initiative
330:Three Mile Creek Watershed Restoration
331:Fairhope Area Community-Based Comprehensive Land Use Plan
332:Working Waterfront and Greenspace Restoration Project
333:Southwest Coastal Alabama Resiliency and Stewardship Center as
334:Mississippi Sound Coastal Eco-Tourism and Aquaculture Village
335:Maintaining and Expanding Information Infrastructure for Shipping and Boating Safety and Efficiency in Mobile Bay
336:Weeks Bay East Gateway Tract
337:Magnolia River North Gateway Tract
338:Development of New Wastewater Treatment Facility (WWTF) for the City of Chickasaw
339:Salt Aire Shoreline Restoration
340:Beach Club West
341:Estimating vital rates of loggerheads in the northern Gulf of Mexico using traditional mark-recapture and genetics
342:Research and monitoring of sea turtles in Alabama waters
343:Lower Dog river Bottomland Hardwoods Protection
344:Dog River Watershed Restoration
347:Environmentally-friendly alternatives to bulkheads for protecting shorelines: evaluation and implementation of two living shoreline designs
348:Dauphin Island West End Acquisition
349:Dog River Watershed Water Quality Restoration
350:Reducing runoff pollution in coastal waters through marsh restoration: a decision support tool for stakeholders
351:Fowl River Watershed Headwaters Conservation and Restoration Program
352:Deer River Coastal Marsh Stabilization and Restoration
353:West Fowl River Pathogen Study
354:Bayou La Batre Pathogen Study
355:Old River Recreation Access Area - Gulf State Park
356:Comprehensive Shoreline Restoration Plan for Coastal Communities in Alabama
358:Bayou Le Batre Nutrient Reduction Project
359:Fort Morgan Parkway Trail Extension
360:Fowl River Watershed Nutrient Reduction Program
361:Phased Recreation Facilities Development at Meaher State Park
362:Nutrient Reduction Projects - Mobile and Baldwin Counties
363:Presence, Potential Sources, Behavior and Fate of Endocrine Disrupting Chemicals in Northern Gulf of Mexico Estuarine Systems
364:New RV Campground Facilities at Gulf State Park
365:New Pier at Alabama/Florida Point (Gulf State Park)
366:Expansion of Beach Access Areas - Cotton Bayou & Romar Beach - Gulf State Park
367:Boggy Point Shoreline Restoration & Stabilization - Gulf State Park
368:An evaluation of the Eastern oyster (Crassostrea virginica) as a biological surrogate for aquatic ecological health of Alabama estuaries: relations to hydrological, chemical, and physical variables
369:Benthic Invertebrate Community Response and Recovery Rates following Barrier Shoreline Restoration Projects and Potential Impacts to the Habitats of the Threatened Piping Plover (Charadrius melodus) and Other Wintering and Migratory Shorebirds
370:Bon Secour River Stormwater Wetland
371:Mobile Bay Western Shore acreage
372:Alabama Oyster Restoration Group
373:Informing Barrier Island and Dune Habitat Restoration by Quantifying Dune Vegetation and Elevation Linkages and Evolution
374:Gulf State Park/Meaher State Park Habitat Restoration
375:Restoring marine turtle reproductive output by identifying and eliminating threats
376:Restoring Submerged Aquatic Vegetation in Coastal Alabama: Overcoming Roadblocks to Recovery
377:Feasibility study of potential oyster reef restoration substrates and development of a shell/substrate budget to inform restoration efforts across coastal Alabama.
378:Coastal Infrastructure and Monitoring for the AL Coast
380:Fowl River Corridor Restoration, Part II
381:Fowl River Corridor Restoration, Part I
383:Dirt Road Paving (Sediment Reduction) Program
384:Alabama Point Seawall Restoration
385:Canal Road Improvements East of SR 161
386:City of Satsuma - 3rd Street Drainage Canal Restoration
387:Oyster Restoration in Coastal Alabama
388:Half-Shell High School
389:North Sewer Force Main Upgrade
390:Increasing the resilience of sea turtle habitat along developed coastlines to restore hatchling production
391:Purchasing City Hall for Creola
392:Gulf Coast Exploreum Downtown Mobile Tourism Impact Project
393:Wolf Bay Bridge and Connecting Roads
394:Implementing Stormwater Management Improvements for Toulmins Springs Branch and Gum Tree Branch
395:Perdido Bluff
396:Sewer System Upgrades Pahse I
398:Sewer System Upgrades Phase II
400:Restoring sea turtle reproductive output by incorporating inundation vulnerability into management practices
401:Little Lagoon Restoration Project
402:Restoration and Debris Removal of Bayou Sara and Norton Creek
403: POA Isle Dauphine Beach Restoration
404:John Mincy Gulf Coast Innovation Lab
405:“Gulf Seafood Gala”™ and ARTSealab Fest
406:Restoration of Isle Dauphine facilities and certain amenities
407:Mobile Airport Authority Enhancements (Phase 1,2,3)
408:Mobile Airport Authority Feasibility Studies and Planning
409:Land Acquisition to Optimize Brookley Aeroplex Services
410:Lackawanna Erosion Mitigation
411:Strategic Floodplain Acquisitions
412:Eastern Shore Sanitary Sewer Overflows (SSOs) Prevention Plan
413:One Mobile: Reconnecting People, Work and Play through Complete Streets
414:Stormwater Drainage Improvements in the Dog River and Three Mile Creek
415:Mobile Port Pier Project
416:Water Street: Complete Streets Project (Phase 2)
417:Pre-restoration Planning for Baker Branch - a Tributary of Fish River
418:Mobile County Comprehensive Recreation Plan
419:Developing and Implementing a Plan to Monitor the Social and Ecological Outcomes of Restoration Projects on Mobile Bay
420:Sunset Islands (Old River AL) Seagrass Protection and Restoration Project
421:Using ecological conditions to develop oyster-focused decision-support tools for determining restoration potential, benefits, or impacts for estuarine sites in Alabama
422:??North? ?Mobile? ?County? ?Food? ?Park? ?&? ?Market? ?(NoMoCo)?
423:Baldwin County ICW Boat Launch
425:Town of Perdido Beach stormwater and coastal shoreline protection project
427:Town of Perdido Beach coastal shoreline protection and living shorelines
428:Bon Secour National Wildlife Refuge Recreation Enhancement
429:Adaptive coastal management plan for Dauphin Island
430:Water Quality iIprovements to Enhance Baldwin County, AL Stream and River Habitats, Phase I
432:Lower Alabama Cooperative Invasive Species Management Area (LA CISMA) Invasive Species Removal Project
433:Gulf Oak Ridge Maritime Forest Preservation
434:Oyster-focused decision-support tools for determining estuarine restoration potential, benefits, or impacts
435:Saving Mobile Bay
436:Blackwater River South tract - land acquisition
437:Town of Perdido Beach Public Access 600 foot Coastal Protection Project and partial living shorelines
438:Bayfront Park Restoration and Improvement Phase II
439:St Andrews Bay/Pilot Town Recreation Area and Kayak Launch
440:Bon Secour National Wildlife Refuge Acquisition Phase III- Pilot Town
441:Due Diligence for Alabama Land Conservation
442:West Fowl River Corridor Acquisition
443:Fort Morgan and Mobile Point Recreational and Habitat Enhancement
444:Historic Barracks Museum and Lodging
445:Mobile County Soccer Complex Phases II & III
446:Alabama Coastal Bird Stewardship Program Phase II (ALCBSP-II)
447:Gulf State Park Pier Renovation
448:Coyote Removal to Benefit Beach-nesting Birds & Adult Snowy Plover Survivorship Analyses
449:Fowl River Corridor Restoration, Part I
450:Hunter Marina Property, Aloe Bay
451:Coordinated Tidal Marsh Bird Monitoring for the Northern Gulf of Mexico – Alabama
452:Alabama Coast-wide Modeling Framework
453:Halls Mill Creek I-10 Land Acquisition
454:Mobile Peninsula Visitor Information Center
455:Grand Batture Shoals Seagrass Protection and Conservation Project
456:Confederate Canyon Erosion Mitigation
457:Coastal Alabama Sea Turtle Lighting Retrofit Expansion Proposal
458:Innovative By Design- Water-Infrastructure Management Center
459:Graham Creek Nature Preserve Expansion
460:Pelican Bay Tract
461:Little Billy Goat Hole Boat Launch Repair
462:Assessment and Prediction of Hypoxia in Mobile Bay for Water Quality and Living Resources Management and Restoration
463:Assessment, Remediation, and Management of Stormwater Detention Ponds in Weeks Bay Watershed - Phase 1
464:The Clotilda Memorial
467:Little Billy Goat Hole Boat Ramp Replacement and East End Beach Access Improvements
468:Lillian Swamp Complex Shoreline Design
469:Wolf Bay Acquisition and Shoreline Design
470:Fowl River Corridor Restoration, Part I
471:Fowl River Corridor Restoration, Part II
476:Protected Lands Long-term Stewardship Initiative
477:Beneficial Use of Dredge Material Placement Funds
478:Alabama Coastal Adaptive Management
479:West Fowl River and Heron Bay Corridor Acquisition
481:Lillian Swamp Complex Shoreline Design
482:Graham Creek Preserve Expansion
483:Drainage and water quality improvement project for the Town of Perdido Beach
485:Confederate Canyon Restoration
486:Lackawanna Drainageway Restoration
487:City of Fairhope SSO Mitigation Project
488:Mapping Bayou la Batre Stormwater and Initiating Improvements for Community Resilience
489:Canby Canyon Restoration
491:Building the Northern Gulf’s Transportation Hub Resilience
494:Baldwin County Road 32 Bridge Replacement
495:Sustainable Management of Stormwater for a More Resilient Coastal Community
496:Lawrence Road Extension
497:Baldwin County Rd 48 Extension (Bohemian Hall Rd to CR-49)
498:Baldwin County Rd 48 Extension (East Blvd to Sawyer Rd)
499:Baldwin County Rural Roads Erosion & Runoff Improvements
501:Baldwin CR 55 at CR 32 Intersection Realignment
502:Josephine Park Improvements
503:MAWSS Sewer Rehabilitation at Cypress Shores and Wright Smith WWTP
504:Corn Branch Tributary Restoration
505:Kelly Pit Mitigation
506:Baldwin County Finfish Habitat Restoration in Magnolia River
507:Finfish Habitat Restoration in Bon Secour River
508:Planning Resilience in Perdido Bay System Through Shoreline Assessments, Tools, and Designs
509:Red Gully Stream Bank Stabilization
510:Countywide Public Parks Entrance Improvements
511:New Parks Connecting Fort Morgan Trail
512:Ebb Tide Lane Park
513:Waterway Village Project
515:Alabama State Port Authority Container Terminal Expansion
516:Driving industry growth potential and restoration durability by tapping new markets for the commercial oyster aquaculture industry of coastal Alabama.
517:Norton Creek Sanitary Sewer Inflow and Infiltration Project
518:Feather the Nest
520:Dauphin Island Stormwater Masterplan and Drainage Improvements
521:Upper Mobile Bay Beneficial Use Wetland Creation Project
522:Oakmont Subdivision Wastewater Extension
523:Dunham Farms Subdivision Wastewater Extension
524:Dauphin Island Parkway Sewer Extension Phase 1
525:Dauphin Island Parkway Sewer Extension Phase 2
526:DISL Aquarium Modernization
527:Orange Beach Green Infrastructure Demonstration Project
528:Fairhope Storm Water Infrastructure Inventoy
529:Orange Beach Stormwater Master Plan
530:City of Fairhope Water Distribution Upgrades
531:DISL Resilient Marine Science Research Building
532:Cypress Point Ecological Park
533:Seawall at Claude Peteet Mariculture Center
534:Water System Capacity Expansion for the Town of Loxley
535:Alabama Coastal Sports Complex
536:Aloe Bay Harbor Phase II
537:Mobile County Soccer Complex
538:Mobile County Aquatic Center
539:Aloe Bay Harbor Phase II
540:Renovation of DISL Marine Science Hall
541:Transforming Daphne's Bayfront Park into Coastal Alabama's Premier Waterfront Recreation Destination Through the Construction of Pubic Access Improvements Using Green Infrastructure and Low Impact Design Strategies
542:Prichard Business Ecosystem Project
543:GCERS Lodging and Dining Facilities
544:Creating New EcoSports Tourism through Green infrastructure and Low Impact Design Strategies at Daphne’s Al Trione Sports Complex
545:Alabama State Port Authority Warehouse LED Lighting Upgrade
546:Water and Sediment Quality Baseline Monitoring Across Restoration Sites and Sub-estuaries of Coastal Alabama
547:Addressing Workforce Development Needs of the Seafood and Fishing Industries
548:Wolf Bay Watershed Plan Implementation
549:Northwest Satsuma Water and Sewer Project Phase 2
550:Fort Morgan State Historic Site Tour Revitalization and Infrastructure Enhancement Project
551:Threemile Creek Improvements Project USA Campus
552:Gulf Coast Nature Center
553:Coastal Alabama Septic Tank Replacement Project: Addressing a non-point source pollution at the source
554:Baldwin County Water Monitoring Network
555:Fort Morgan State Historic Site Barracks Reconstruction Project
556:Magnolia Springs Groundwater Recharge Pilot Project
557:Fowl River Road to Joe Carl Road Pumping Station
558:Gulf Frontal Watershed Implementation
559:Oyster Restoration in Middle Mobile Bay: Designing, Building, and Planning for the Future
560:North System Sewer Improvements Phase 2, Priority 2
561:Africatown Welcome Center Design
562:Wolf Bay West Bank/Long Bayou Restoration
563:PERCH CREEK PRESERVE IMPLEMENTATION (including Helen Wood Park and Blueway Trail)
564:North System Sewer Improvements Phase 3, Priority 1
565:North System Sewer Improvements Phase 3, Priority 2
566:CREPE MYRTLE TRAIL DESIGN AND IMPLEMENTATION
567:Force Main Upgrade from Bryant High School to County Road 19
568:Bayou La Batre City Docks Property Acquisition and Dry Storage Facilty
569:Sewer Service To Grand Bay Phase 1
570:Sewer Service To Grand Bay Phase 2
571:DIWSA Sewer Collection System Improvements
572:Fish River Watershed Sediment & Stormwater Improvements